PRACTICAL GUIDES · WORKED EXAMPLES · TOOLS YOU CAN USE
Business
Starter Guides

KENYA · GUIDE 0457 · EDITION 4.7

Balcony bench making in Kenya: Pricing, Costing and Cash Flow Example

Editorial update: 28 October 2026 · Business planning reference · Review scope

Use one accepted sale unit throughout

Work through a fictional KSh 24,500.00 invoice against KSh 18,500.00 of selected cost lines; distinguish the invoice from collected cash.

This is a planning reference for balcony bench making. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.

The example offer and its boundary

Fictional sample order: One outdoor balcony bench brief, approximately 1.2 m long, built only after competent furniture design and verification that placement/loading is appropriate for the balcony. No attachment to balustrades, child-climbing aid or structural-capacity opinion by the maker. Owner obtains needed building advice.

Charging basis to confirm: bench. The rates and quantities below are teaching assumptions. Even a previously recorded listing is not adopted here as a current quotation or an earnings forecast.

Itemised arithmetic

Selected input/activityQuantityAssumed unit rateSelected cost
Timber allowance1KSh 5,500.00KSh 5,500.00
Maker hours18KSh 500.00KSh 9,000.00
Outdoor hardware/finish1KSh 2,400.00KSh 2,400.00
Delivery/handling1KSh 1,600.00KSh 1,600.00
CalculationTeaching result
Selected cost totalKSh 18,500.00
Priced/accepted output1 example units
Assumed selling priceKSh 24,500.00
Assumed invoiceKSh 24,500.00
Difference before excluded costs and taxKSh 6,000.00

Illustrative batch cost = 1 × 5500 + 18 × 500 + 1 × 2400 + 1 × 1600 = KSh 18,500.00; cost per priced unit KSh 18,500.00. Revenue = 1 × KSh 24500 = KSh 24,500.00; pre-tax difference KSh 6,000.00. Building professional fees, anchoring and balcony repair are excluded. Actual support and cut-list quantities replace material allowance before final quote. Tax, premises, finance and actual rework must be added where applicable; no guaranteed earnings.

Check cash timing and a weaker outcome

TRAINING-0457: a fictional order for the scoped offer in section 01, using 1 priced units at KSh 24,500.00 each. Buyer group: Apartment households and small cafes. No buyer was contacted and no order was completed.

Teaching invoice = 1 x KSh 24,500.00 = KSh 24,500.00. The selected input lines in section 06 total KSh 18,500.00; their difference from this assumed invoice is KSh 6,000.00 before excluded costs and tax.

For cash-timing practice only, suppose a buyer pays a 30% advance of KSh 7,350.00. The invoice balance is KSh 17,150.00. If the selected input bill is paid before the balance arrives, additional cash of KSh 11,150.00 is needed after applying the advance. The advance is counted once, not again at final collection.

On full collection, total receipts are KSh 24,500.00. Cash against the selected example bill is KSh 6,000.00 before other payments. If a hypothetical 10% increase in the largest selected line (Maker hours) adds KSh 900.00, the unchanged invoice leaves KSh 5,100.00 against that revised bill.

If the customer instead leaves 10% of the invoice unpaid, KSh 2,450.00 is a receivable. Cash collected is KSh 22,050.00 and collected cash less the selected bill is KSh 3,550.00. This differs from invoice margin; do not spend the unpaid amount as though it is already cash.

The scenario is complete only as a teaching record of the stated lines. Add actual excluded startup and operating costs using file 12, and replace every assumed rate before relying on a quote. Use measured accepted output for the actual invoice; unaccepted output is not automatically chargeable.

For an actual quote, add all relevant excluded costs, use measured accepted output, and compare amounts from the same period. An unpaid invoice balance is not available cash. A deposit held for an uncompleted obligation is not automatically earned income.

References and their limits

Wolman F&P exterior wood finish
Manufacturer exterior timber finish context; actual local product instructions, end use and cure govern. Reference check recorded 2026-10-26.

NCA functions and contractor register
Official route for construction competence and contractor information; photographic observations are not structural or statutory certification. Reference check recorded 2026-10-26.

Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.

Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.

Editorial method and evidence limits

Explore this guide by chapter