PRACTICAL GUIDES · WORKED EXAMPLES · TOOLS YOU CAN USE
Business
Starter Guides

KENYA · GUIDE 0013 · EDITION 4.2

Carrot growing in Kenya: Pricing and Break-Even

Price an accepted unit, not an activity title

Start with this sale unit: graded kilogram.

Separate carrots for whole-root retail from carrots intended for chopping or cooking, giving usable irregular roots a deliberate buyer rather than treating them as waste.

A quotation needs the accepted quantity or scope, exclusions, completion point, delivery arrangement and payment schedule. Without that specification, two apparently similar prices may pay for different work.

Build the direct-cost sheet

  • seed
  • soil preparation
  • grade-out

Include lifting damage, washing effort and grading labour in the root account, with actual prices for irregular roots rather than assuming they achieve display-grade returns.

CalculationHow to use it
Variable cost per accepted unitDirect inputs, labour, delivery and measured losses divided by accepted units.
Contribution per unitAgreed selling price minus variable cost per unit.
Period operating surplusContribution from units sold minus fixed overhead for the same period.
Break-even unitsFixed overhead divided by positive contribution, rounded up.

Count rejected output, unsold stock and correction time. Keep fixed overhead in a consistent period; a daily contribution cannot be compared directly with a monthly overhead figure. If contribution is zero or negative, extra sales do not establish a workable break-even point.

Reconcile the cash separately

A customer's unpaid balance cannot pay today's supplier bill. List actual collections, advance payments, supplier deadlines, refunds and recurring bills by date. Separate refundable deposits and money held for an uncompleted commitment from funds freely available for expansion.

The enterprise loses margin when aggressive cleaning makes roots look attractive initially but damages their presentation before the customer can display or prepare them normally.

Test a weaker outcome

Recalculate with fewer accepted units, a delayed customer collection or a higher input quotation. Change one assumption at a time to see which constraint matters. Use the actual pilot record: Track root shapes by bed section, harvest damage, preparation work and buyer-assigned grade so the next planting improves the causes of rejection actually observed locally.

Do not interpret the invented financial teaching exercise in the complete manuscript as a market price or predicted income. Replace its assumptions before using it for a real decision. The public planning tool can help with arithmetic; it does not validate the inputs.

Work through this business's example

Test the listed example when things change

These calculations are invented teaching cases derived from this guide's example, "Invented teaching scenario; not a market quotation or income forecast". They are not observed customer results, local quotations or forecasts. They hold the listed input bill constant unless the row explicitly changes it. Excluded expenses and tax still need to be added.

CaseAccepted / priced outputExample revenueListed costDifference before excluded costs / tax
Original example40KSh 2,200.00KSh 1,650.00KSh 550.00
20% fewer accepted units, rounded down32KSh 1,760.00KSh 1,650.00KSh 110.00
10% reduction in the assumed selling price40KSh 1,980.00KSh 1,650.00KSh 330.00
10% increase in every listed cost40KSh 2,200.00KSh 1,815.00KSh 385.00

The lower-acceptance case represents the loss of priced output, not a prediction of the actual reject rate. With 32 accepted units, the same listed bill costs KSh 51.56 per accepted unit. Do not divide it by the original 40 units and hide the loss. A whole-job price needs its own agreed acceptance and partial-payment treatment.

Inspect the cost that can change the decision

The largest listed line is Bed preparation and thinning, worker hours: 4 at KSh 150.00, giving KSh 600.00. A 10% increase in this line alone adds KSh 60.00 to the example bill. Check its exact unit, scope, quotation validity and whether it is a one-off resource or a repeat input before changing the quote.

Keep every input quantity separate from priced output. A fall in accepted output does not automatically reduce already-purchased inputs. Use the itemised costing tool to change the real quantities, rather than scaling the whole bill by a sales percentage.

Connect the commercial check to quality

For carrot growing, investigate this concrete failure: Roots break during lifting. The guide's diagnostic check is: Compare break location with tool position and soil resistance. Proposed response: Loosen alongside the roots and recheck a small section before continuing..

Record what was actually found and rechecked; do not mark a corrected item accepted until the agreed buyer checkpoint has passed. Any rework materials, transport, labour or credit must be added to the actual cost/result record.

A cash-timing exercise using the same example

Assume solely for arithmetic practice that opening cash is zero and the entire listed input bill of KSh 1,650.00 must be paid before handover. With no advance, that amount must be funded before any sale is collected. This deliberately simplified case does not establish when your actual suppliers need payment.

If a buyer hypothetically pays a 30% advance on the example revenue of KSh 2,200.00, cash received would be KSh 660.00. Paying the listed bill then leaves KSh -990.00. The additional cash needed to avoid a negative balance at that point is KSh 990.00. The unpaid remainder is KSh 1,540.00; it is a receivable, not cash already in the business.

The 30% figure is an invented teaching assumption, not a recommended or agreed customer term. Check whether deposits are refundable and which commitments they can actually fund. Do not count the advance again when entering the final collection. Add equipment payments, tax, owner drawings and unlisted operating bills to the dated cash plan as appropriate. The 13-week planner in file 10 shows week-end funding gaps; inspect intra-week dates for a large payment.

Explore this guide by chapter