Use one accepted sale unit throughout

Work through a fictional KSh 7,000.00 invoice against KSh 7,210.00 of selected cost lines; distinguish the invoice from collected cash.

This is a planning reference for frozen ready-meal supply. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.

The example offer and its boundary

Fictional FROZEN-157 is a development pilot of 20 single-portion 500 g bean-and-vegetable ready meals,10 kg finished output. Commercial sale is gated on a competent validated cooking, cooling, freezing, storage, transport and reheating process plus justified shelf life. The sample release record has batchF01, recipe/version,20 pack weights, actual control readings, freezer location and release approver; no expiry date is invented.

Charging basis to confirm: frozen meal pack. The rates and quantities below are teaching assumptions. Even a previously recorded listing is not adopted here as a current quotation or an earnings forecast.

Itemised arithmetic

Selected input/activityQuantityAssumed unit rateSelected cost
Cooked-recipe beans dry kg3KSh 200.00KSh 600.00
Vegetables kg5KSh 80.00KSh 400.00
Oil litres0.5KSh 300.00KSh 150.00
Seasoning portions20KSh 8.00KSh 160.00
Freezer packs20KSh 35.00KSh 700.00
Production hours6KSh 400.00KSh 2,400.00
Process-development hours4KSh 700.00KSh 2,800.00
CalculationTeaching result
Selected cost totalKSh 7,210.00
Priced/accepted output20 example units
Assumed selling priceKSh 350.00
Assumed invoiceKSh 7,000.00
Difference before excluded costs and taxKSh -210.00

Fictional pilot cost 600+400+150+160+700+2,400+2,800=7,210. Twenty assumed 350 sales would yield 7,000 and a 210 loss before tax, even before equipment, energy, testing, shelf-life validation, transport and waste. Sales remain prohibited by this scenario's release gate until actual validation; the math is development planning, not a sale-ready margin.

Check cash timing and a weaker outcome

TRAINING-0157: a fictional order for the scoped offer in section 01, using 20 priced units at KSh 350.00 each. Buyer group: Households and retailers with suitable storage. No buyer was contacted and no order was completed.

Teaching invoice = 20 x KSh 350.00 = KSh 7,000.00. The selected input lines in section 06 total KSh 7,210.00; their difference from this assumed invoice is KSh -210.00 before excluded costs and tax.

For cash-timing practice only, suppose a buyer pays a 30% advance of KSh 2,100.00. The invoice balance is KSh 4,900.00. If the selected input bill is paid before the balance arrives, additional cash of KSh 5,110.00 is needed after applying the advance. The advance is counted once, not again at final collection.

On full collection, total receipts are KSh 7,000.00. Cash against the selected example bill is KSh -210.00 before other payments. If a hypothetical 10% increase in the largest selected line (Process-development hours) adds KSh 280.00, the unchanged invoice leaves KSh -490.00 against that revised bill.

If the customer instead leaves 10% of the invoice unpaid, KSh 700.00 is a receivable. Cash collected is KSh 6,300.00 and collected cash less the selected bill is KSh -910.00. This differs from invoice margin; do not spend the unpaid amount as though it is already cash.

The scenario is complete only as a teaching record of the stated lines. Add actual excluded startup and operating costs using file 12, and replace every assumed rate before relying on a quote. Use measured accepted output for the actual invoice; unaccepted output is not automatically chargeable.

For an actual quote, add all relevant excluded costs, use measured accepted output, and compare amounts from the same period. An unpaid invoice balance is not available cash. A deposit held for an uncompleted obligation is not automatically earned income.

References and their limits

Public Health Checklist for Food Hygiene Licensing — Kenya MoH, March 2023
March 2023 checklist covers premises, hygiene controls and records; confirm current county implementation and requirements directly; no fee quoted. Reference check recorded 2026-10-26.

Safe Method: Freezing — FSA
Small portions, safe chilling before freezing and freezer checks; no product-specific shelf life or Kenyan legal status established. Reference check recorded 2026-10-26.

Safer food, better business for caterers — FSA
Food-safety management, cross-contamination, cleaning, chilling and cooking reference; UK requirements are not Kenyan law. Reference check recorded 2026-10-26.

Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.

Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.

Editorial method and evidence limits

Explore this guide by chapter