Use one accepted sale unit throughout
Work through a fictional KSh 10,500.00 invoice against KSh 8,200.00 of selected cost lines; distinguish the invoice from collected cash.
This is a planning reference for glass partition fitting. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.
The example offer and its boundary
Fictional sample order: Coordinate a specialist quotation for one 2.4 m wide by 2.4 m high internal glazed partition with an identified door requirement. The glazing contractor owns pane, support, hardware and applicable safety design. Survey and design review are priced first; full fabrication follows approved drawings. Exclude cutting/drilling processed glass on site, structural glazing advice by the coordinator and a generic thickness prescription.
Charging basis to confirm: partition area. The rates and quantities below are teaching assumptions. Even a previously recorded listing is not adopted here as a current quotation or an earnings forecast.
Itemised arithmetic
| Selected input/activity | Quantity | Assumed unit rate | Selected cost |
|---|---|---|---|
| Specialist survey/design assumption | 1 | KSh 4,500.00 | KSh 4,500.00 |
| Coordinator measurement/review hours | 3 | KSh 500.00 | KSh 1,500.00 |
| Drawing/report allocation | 1 | KSh 1,000.00 | KSh 1,000.00 |
| Two site trips | 2 | KSh 600.00 | KSh 1,200.00 |
| Calculation | Teaching result |
|---|---|
| Selected cost total | KSh 8,200.00 |
| Priced/accepted output | 1 example units |
| Assumed selling price | KSh 10,500.00 |
| Assumed invoice | KSh 10,500.00 |
| Difference before excluded costs and tax | KSh 2,300.00 |
Illustrative batch cost = 1 × 4500 + 3 × 500 + 1 × 1000 + 2 × 600 = KSh 8,200.00; cost per priced unit KSh 8,200.00. Revenue = 1 × KSh 10500 = KSh 10,500.00; pre-tax difference KSh 2,300.00. Only survey/design coordination is priced. 2.4 × 2.4 = 5.76 square metres is opening area, not a supplied-glass bill; full fabrication needs actual approved quantities and quote. Tax, premises, finance and actual rework must be added where applicable; no guaranteed earnings.
Check cash timing and a weaker outcome
TRAINING-0417: a fictional order for the scoped offer in section 01, using 1 priced units at KSh 10,500.00 each. Buyer group: Small offices and shop owners dividing internal space. No buyer was contacted and no order was completed.
Teaching invoice = 1 x KSh 10,500.00 = KSh 10,500.00. The selected input lines in section 06 total KSh 8,200.00; their difference from this assumed invoice is KSh 2,300.00 before excluded costs and tax.
For cash-timing practice only, suppose a buyer pays a 30% advance of KSh 3,150.00. The invoice balance is KSh 7,350.00. If the selected input bill is paid before the balance arrives, additional cash of KSh 5,050.00 is needed after applying the advance. The advance is counted once, not again at final collection.
On full collection, total receipts are KSh 10,500.00. Cash against the selected example bill is KSh 2,300.00 before other payments. If a hypothetical 10% increase in the largest selected line (Specialist survey/design assumption) adds KSh 450.00, the unchanged invoice leaves KSh 1,850.00 against that revised bill.
If the customer instead leaves 10% of the invoice unpaid, KSh 1,050.00 is a receivable. Cash collected is KSh 9,450.00 and collected cash less the selected bill is KSh 1,250.00. This differs from invoice margin; do not spend the unpaid amount as though it is already cash.
The scenario is complete only as a teaching record of the stated lines. Add actual excluded startup and operating costs using file 12, and replace every assumed rate before relying on a quote. Use measured accepted output for the actual invoice; unaccepted output is not automatically chargeable.
For an actual quote, add all relevant excluded costs, use measured accepted output, and compare amounts from the same period. An unpaid invoice balance is not available cash. A deposit held for an uncompleted obligation is not automatically earned income.
References and their limits
Pilkington safety versus security glass
Manufacturer distinction between safety and security performance; local glazing design requirements remain professional decisions. Reference check recorded 2026-10-26.
Pilkington toughened glass
Manufacturer processed-glass identity and application context; no universal pane thickness or partition design. Reference check recorded 2026-10-26.
Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.
Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.