Metal planter fabrication in Kenya: Pricing, Costing and Cash Flow Example

Editorial update: 28 October 2026 · Business planning reference · Review scope

Use one accepted sale unit throughout

Work through a fictional KSh 19,500.00 invoice against KSh 14,450.00 of selected cost lines; distinguish the invoice from collected cash.

This is a planning reference for metal planter fabrication. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.

The example offer and its boundary

Fictional three-piece order: freestanding cylindrical decorative metal outer planters, each nominal 300 mm outside diameter × 300 mm high, receiving three separately supplied removable nursery-pot liners. The metal shell is ornamental ground-supported furniture, not a sealed reservoir, hanging planter or balcony fixing. A competent fabricator approves sheet thickness, seams, base, edge finish and actual liner/drainage arrangement; dimensions are an example, not a structural capacity claim. Deliver a measured prototype as the first of the three, then two matching units.

Charging basis to confirm: planter. The rates and quantities below are teaching assumptions. Even a previously recorded listing is not adopted here as a current quotation or an earnings forecast.

Itemised arithmetic

Selected input/activityQuantityAssumed unit rateSelected cost
Sheet allowance, square metres2KSh 2,200.00KSh 4,400.00
Liners budgeted3KSh 350.00KSh 1,050.00
Fabricator hours12KSh 550.00KSh 6,600.00
Drain/base/finish supplies1KSh 1,700.00KSh 1,700.00
Delivery1KSh 700.00KSh 700.00
CalculationTeaching result
Selected cost totalKSh 14,450.00
Priced/accepted output3 example units
Assumed selling priceKSh 6,500.00
Assumed invoiceKSh 19,500.00
Difference before excluded costs and taxKSh 5,050.00

Illustrative batch cost = 2 × 2200 + 3 × 350 + 12 × 550 + 1 × 1700 + 1 × 700 = KSh 14,450.00; cost per priced unit KSh 4,816.67. Revenue = 3 × KSh 6500 = KSh 19,500.00; pre-tax difference KSh 5,050.00. Three units include any approved sample as one of the delivered pieces. Final sheet yield and liner compatibility require actual checks. Tax, premises, finance and actual rework must be added where applicable; no guaranteed earnings. The added 300 mm height is a fictional dimensional brief; sheet thickness and final cut list remain qualified decisions. The existing KSh 1,700 combined drain/base/finish assumption is retained as an unverified budget, not a complete supplier bill; itemize actual components before final quotation.

Check cash timing and a weaker outcome

TRAINING-0438: a fictional order for the scoped offer in section 01, using 3 priced units at KSh 6,500.00 each. Buyer group: Garden shops, hotels and decor buyers. No buyer was contacted and no order was completed.

Teaching invoice = 3 x KSh 6,500.00 = KSh 19,500.00. The selected input lines in section 06 total KSh 14,450.00; their difference from this assumed invoice is KSh 5,050.00 before excluded costs and tax.

For cash-timing practice only, suppose a buyer pays a 30% advance of KSh 5,850.00. The invoice balance is KSh 13,650.00. If the selected input bill is paid before the balance arrives, additional cash of KSh 8,600.00 is needed after applying the advance. The advance is counted once, not again at final collection.

On full collection, total receipts are KSh 19,500.00. Cash against the selected example bill is KSh 5,050.00 before other payments. If a hypothetical 10% increase in the largest selected line (Fabricator hours) adds KSh 660.00, the unchanged invoice leaves KSh 4,390.00 against that revised bill.

If the customer instead leaves 10% of the invoice unpaid, KSh 1,950.00 is a receivable. Cash collected is KSh 17,550.00 and collected cash less the selected bill is KSh 3,100.00. This differs from invoice margin; do not spend the unpaid amount as though it is already cash.

The scenario is complete only as a teaching record of the stated lines. Add actual excluded startup and operating costs using file 12, and replace every assumed rate before relying on a quote. Use measured accepted output for the actual invoice; unaccepted output is not automatically chargeable.

For an actual quote, add all relevant excluded costs, use measured accepted output, and compare amounts from the same period. An unpaid invoice balance is not available cash. A deposit held for an uncompleted obligation is not automatically earned income.

References and their limits

Tononoka steel catalogue
Manufacturer catalogue search result identifies Kenya steel product families/specifications; no chosen section, engineering capacity or current price established. Reference check recorded 2026-10-26.

Lincoln Electric safe-use guide
Manufacturer welding consumable, fume, electrical and fire hazards; qualified fabricator must establish the actual safe process. Reference check recorded 2026-10-26.

Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.

Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.