PRACTICAL GUIDES · WORKED EXAMPLES · TOOLS YOU CAN USE
Business
Starter Guides

KENYA · GUIDE 0386 · EDITION 4.2

Shelf installation in Kenya: Pricing and Break-Even

Price an accepted unit, not an activity title

Start with this sale unit: shelf installation.

Agree what the shelf will hold and identify the wall construction before selecting supports, using competent advice where substrate condition or concealed services create uncertainty.

A quotation needs the accepted quantity or scope, exclusions, completion point, delivery arrangement and payment schedule. Without that specification, two apparently similar prices may pay for different work.

Build the direct-cost sheet

  • wall type
  • brackets
  • fixings
  • access

Include wall assessment, unsuitable-substrate visits, finishing repairs and fitting hardware, because a shelf's board cost says little about the complexity of its actual installation.

CalculationHow to use it
Variable cost per accepted unitDirect inputs, labour, delivery and measured losses divided by accepted units.
Contribution per unitAgreed selling price minus variable cost per unit.
Period operating surplusContribution from units sold minus fixed overhead for the same period.
Break-even unitsFixed overhead divided by positive contribution, rounded up.

Count rejected output, unsold stock and correction time. Keep fixed overhead in a consistent period; a daily contribution cannot be compared directly with a monthly overhead figure. If contribution is zero or negative, extra sales do not establish a workable break-even point.

Reconcile the cash separately

A customer's unpaid balance cannot pay today's supplier bill. List actual collections, advance payments, supplier deadlines, refunds and recurring bills by date. Separate refundable deposits and money held for an uncompleted commitment from funds freely available for expansion.

A customer later stores heavy equipment on a decorative shelf because the installer never recorded intended use or explained the limitations of that particular wall arrangement.

Test a weaker outcome

Recalculate with fewer accepted units, a delayed customer collection or a higher input quotation. Change one assumption at a time to see which constraint matters. Use the actual pilot record: Record substrate observations, support choice, intended contents and installation exceptions, then separate standard suitable-wall fittings from jobs needing specialist assessment before accepting repeat bookings.

Do not interpret the invented financial teaching exercise in the complete manuscript as a market price or predicted income. Replace its assumptions before using it for a real decision. The public planning tool can help with arithmetic; it does not validate the inputs.

Work through this business's example

Test the listed example when things change

These calculations are invented teaching cases derived from this guide's example, "Fictional worked budget, all input prices illustrative". They are not observed customer results, local quotations or forecasts. They hold the listed input bill constant unless the row explicitly changes it. Excluded expenses and tax still need to be added.

CaseAccepted / priced outputExample revenueListed costDifference before excluded costs / tax
Original example2KSh 9,000.00KSh 6,900.00KSh 2,100.00
20% fewer accepted units, rounded down1KSh 4,500.00KSh 6,900.00KSh -2,400.00
10% reduction in the assumed selling price2KSh 8,100.00KSh 6,900.00KSh 1,200.00
10% increase in every listed cost2KSh 9,000.00KSh 7,590.00KSh 1,410.00

The lower-acceptance case represents the loss of priced output, not a prediction of the actual reject rate. With 1 accepted units, the same listed bill costs KSh 6,900.00 per accepted unit. Do not divide it by the original 2 units and hide the loss. A whole-job price needs its own agreed acceptance and partial-payment treatment.

Inspect the cost that can change the decision

The largest listed line is Installer labour hours: 3 at KSh 650.00, giving KSh 1,950.00. A 10% increase in this line alone adds KSh 195.00 to the example bill. Check its exact unit, scope, quotation validity and whether it is a one-off resource or a repeat input before changing the quote.

Keep every input quantity separate from priced output. A fall in accepted output does not automatically reduce already-purchased inputs. Use the itemised costing tool to change the real quantities, rather than scaling the whole bill by a sales percentage.

Connect the commercial check to quality

For shelf installation, investigate this concrete failure: Bracket moves at the wall. The guide's diagnostic check is: Stop loading and have the installer assess substrate, fixing choice and installation record.. Proposed response: Restrict use and competently correct or relocate; tightening blindly is not a diagnosis..

Record what was actually found and rechecked; do not mark a corrected item accepted until the agreed buyer checkpoint has passed. Any rework materials, transport, labour or credit must be added to the actual cost/result record.

A cash-timing exercise using the same example

Assume solely for arithmetic practice that opening cash is zero and the entire listed input bill of KSh 6,900.00 must be paid before handover. With no advance, that amount must be funded before any sale is collected. This deliberately simplified case does not establish when your actual suppliers need payment.

If a buyer hypothetically pays a 30% advance on the example revenue of KSh 9,000.00, cash received would be KSh 2,700.00. Paying the listed bill then leaves KSh -4,200.00. The additional cash needed to avoid a negative balance at that point is KSh 4,200.00. The unpaid remainder is KSh 6,300.00; it is a receivable, not cash already in the business.

The 30% figure is an invented teaching assumption, not a recommended or agreed customer term. Check whether deposits are refundable and which commitments they can actually fund. Do not count the advance again when entering the final collection. Add equipment payments, tax, owner drawings and unlisted operating bills to the dated cash plan as appropriate. The 13-week planner in file 10 shows week-end funding gaps; inspect intra-week dates for a large payment.

Explore this guide by chapter