Use one accepted sale unit throughout
Work through a fictional KSh 20,000.00 invoice against KSh 15,360.00 of selected cost lines; distinguish the invoice from collected cash.
This is a planning reference for small wedding meal catering. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.
The example offer and its boundary
Fictional WMEAL-152 caters a 40-guest wedding meal: rice, beef stew and vegetables with two staffed serving points. Final 40 count and menu are signed by couple's authorised lead. Output is component yield sheet, service rota, guest-meal tally and rental/waste closeout; cake, alcohol, structures and unqualified nutritional advice excluded.
Charging basis to confirm: catering guest. The rates and quantities below are teaching assumptions. Even a previously recorded listing is not adopted here as a current quotation or an earnings forecast.
Itemised arithmetic
| Selected input/activity | Quantity | Assumed unit rate | Selected cost |
|---|---|---|---|
| Beef kg | 6 | KSh 650.00 | KSh 3,900.00 |
| Rice kg | 4 | KSh 180.00 | KSh 720.00 |
| Vegetables kg | 7 | KSh 80.00 | KSh 560.00 |
| Oil litres | 1 | KSh 300.00 | KSh 300.00 |
| Seasoning portions | 40 | KSh 12.00 | KSh 480.00 |
| Meal plates/utensil sets | 40 | KSh 35.00 | KSh 1,400.00 |
| Kitchen hours | 10 | KSh 400.00 | KSh 4,000.00 |
| Service hours | 8 | KSh 350.00 | KSh 2,800.00 |
| Transport trips | 2 | KSh 600.00 | KSh 1,200.00 |
| Calculation | Teaching result |
|---|---|
| Selected cost total | KSh 15,360.00 |
| Priced/accepted output | 40 example units |
| Assumed selling price | KSh 500.00 |
| Assumed invoice | KSh 20,000.00 |
| Difference before excluded costs and tax | KSh 4,640.00 |
Illustrative cost 3,900+720+560+300+480+1,400+4,000+2,800+1,200=15,360. Forty assumed 500 meals yield 20,000 and 4,640 before tax. Fuel, rent, equipment hire, extra guests, waste and tax excluded; actual yield and capacity require trial.
Check cash timing and a weaker outcome
TRAINING-0152: a fictional order for the scoped offer in section 01, using 40 priced units at KSh 500.00 each. Buyer group: Couples or appointed wedding coordinators. No buyer was contacted and no order was completed.
Teaching invoice = 40 x KSh 500.00 = KSh 20,000.00. The selected input lines in section 06 total KSh 15,360.00; their difference from this assumed invoice is KSh 4,640.00 before excluded costs and tax.
For cash-timing practice only, suppose a buyer pays a 30% advance of KSh 6,000.00. The invoice balance is KSh 14,000.00. If the selected input bill is paid before the balance arrives, additional cash of KSh 9,360.00 is needed after applying the advance. The advance is counted once, not again at final collection.
On full collection, total receipts are KSh 20,000.00. Cash against the selected example bill is KSh 4,640.00 before other payments. If a hypothetical 10% increase in the largest selected line (Kitchen hours) adds KSh 400.00, the unchanged invoice leaves KSh 4,240.00 against that revised bill.
If the customer instead leaves 10% of the invoice unpaid, KSh 2,000.00 is a receivable. Cash collected is KSh 18,000.00 and collected cash less the selected bill is KSh 2,640.00. This differs from invoice margin; do not spend the unpaid amount as though it is already cash.
The scenario is complete only as a teaching record of the stated lines. Add actual excluded startup and operating costs using file 12, and replace every assumed rate before relying on a quote. Use measured accepted output for the actual invoice; unaccepted output is not automatically chargeable.
For an actual quote, add all relevant excluded costs, use measured accepted output, and compare amounts from the same period. An unpaid invoice balance is not available cash. A deposit held for an uncompleted obligation is not automatically earned income.
References and their limits
Public Health Checklist for Food Hygiene Licensing — Kenya MoH, March 2023
March 2023 checklist covers premises, hygiene controls and records; confirm current county implementation and requirements directly; no fee quoted. Reference check recorded 2026-10-26.
Safer food, better business for caterers — FSA
Food-safety management, cross-contamination, cleaning, chilling and cooking reference; UK requirements are not Kenyan law. Reference check recorded 2026-10-26.
Managing an event
Coordination across load-in and load-out phases; UK guidance, not Kenyan permitting advice. Reference check recorded 2026-10-26.
Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.
Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.
Editorial method and evidence limits