PRACTICAL GUIDES · WORKED EXAMPLES · TOOLS YOU CAN USE
Business
Starter Guides

KENYA · GUIDE 0882 · EDITION 4.7

Custom T-shirt printing in Kenya: Startup Budget and Quotation Checklist

Editorial update: 28 October 2026 · Business planning reference · Review scope

Define what must be funded before the first order

Build a startup quotation schedule for Cotton blanks, Transfer film, Production consumables; separate setup, operating inputs and working cash.

This is a planning reference for custom t-shirt printing. The order below is an invented teaching case. It is not a completed customer job, an operating approval or a prediction of demand or earnings.

The example offer and its boundary

Fictional garment order: print twenty adult cotton T-shirts with one original single-colour 200 × 180 mm front graphic. Size roster: two S, eight M, eight L and two XL. Use a manufacturer-documented heat-transfer film suitable for the actual cotton fabric; purchase one extra same-lot shirt for testing. Scope excludes unlicensed logos, all-over sublimation on ordinary cotton and replacing undisclosed customer-supplied garments under an assumed warranty.

A quotation checklist for this business

ResourceExact request to priceCheck before accepting the quote
Cotton blanksTwenty-one same-fabric shirts including a test piece; sale roster two S/eight M/eight L/two XL.Inspect stitching and colour lot, verify shrink/care information and obtain exact size measurements.
Transfer filmProvisional 2.5 m of 500 mm-wide documented cotton-compatible film in one colour.Confirm usable cutter width and application sheet; no substituted film is accepted without a new sample.
Production consumablesSuitable cutter blade, clean protective sheets, weeding tools and twenty care/packing labels.Use the machine/material makers’ maintenance and replacement guidance; a dull blade can leave unweedable corners.

Keep the budget categories separate

  • Cotton blanks: Twenty-one same-fabric shirts including a test piece; sale roster two S/eight M/eight L/two XL. Confirm the quantity, landed quote and inspect stitching and colour lot, verify shrink/care information and obtain exact size measurements.
  • Transfer film: Provisional 2.5 m of 500 mm-wide documented cotton-compatible film in one colour. Confirm the quantity, landed quote and confirm usable cutter width and application sheet; no substituted film is accepted without a new sample.
  • Production consumables: Suitable cutter blade, clean protective sheets, weeding tools and twenty care/packing labels. Confirm the quantity, landed quote and use the machine/material makers’ maintenance and replacement guidance; a dull blade can leave unweedable corners.
  • Record equipment acquisition OR an appropriate use allocation, plus the full stock/minimum-order cash requirement; do not count both as the same per-job expense.
  • Obtain actual labour, premises, transport, energy/water, rework, payment and ongoing overhead amounts relevant to this activity. Identify deposits, receivables and payment dates separately.
  • Resolve the guide-specific evidence gaps listed in section 10. Any activity-specific permission, testing or specialist costs require actual scope and quotations, not an invented allowance.

What the selected teaching bill includes

Selected lineExample quantityAssumed rateSelected cost
T-shirt blanks including sample21KSh 450.00KSh 9,450.00
500 mm transfer film metres2.5KSh 900.00KSh 2,250.00
Care labels and sleeves20KSh 30.00KSh 600.00
Cutting, weeding and pressing hours8KSh 350.00KSh 2,800.00
Artwork preparation hours2KSh 400.00KSh 800.00

These selected lines total KSh 15,900.00. They are a fictional operating example, not the full cash needed to start custom t-shirt printing. Batch cost = KSh 15900; allocated cost per sale unit = KSh 795.00; assumed revenue = 20 × KSh 1050 = KSh 21000; pre-tax scenario surplus = KSh 5100. Twenty accepted garments are sale units. Film quantity is based on the stated draft nesting, not a guaranteed yield. Rates are fictional; obtain exact fabric/film quotes and add machine wear, power, tax, delivery and any test spoilage. A complicated graphic with many small islands needs a timed weeding trial before accepting the same labour allowance.

Close the budget before spending

For each actual quotation, record the delivered quantity, specification, cash due date, hire/purchase option and quote expiry. Keep an unknown cost blank. Reusable equipment purchase, an appropriate use allocation and refundable deposits are different records; do not count the same item twice.

  • The selected film, cutter/press setup, sample care result and actual garment dimensions are unverified.
  • No observed Kenyan film or shirt price is included.

References and their limits

STAHLS: Avoid Dye Migration in Sublimated Garments
Manufacturer discussion of polyester decoration defects; obtain the actual transfer application sheet. Reference check recorded 2026-10-26.

Sawgrass: Sublimation Heat Press Settings
Manufacturer process-reference route; the actual blank/ink/press instructions and test sample govern the job. Reference check recorded 2026-10-26.

Recorded references support only the scope stated beside them. They do not prove current supplier stock, a local quotation, actual buyer demand, operator competence or the feasibility of this particular business. Later editorial changes do not refresh earlier source-check dates.

Prepared by Business Starter Guides using AI-assisted drafting and desk editorial checks. Independent operator trials and specialist certification are not claimed. See the editorial method for the review scope.

Editorial method and evidence limits

Explore this guide by chapter