Build a budget around the first deliverable
Agree paint boundaries, preparation standard and occupied-room arrangements before colour selection, identifying dampness or unstable surfaces that need assessment rather than simply another coat.
This scope determines what you need before the first order. A national average or a supplier's bundle cannot establish your opening budget. The main cost drivers for this business are:
- paint coverage
- surface preparation
- masking and access
Separate setup, operating cost and working cash
| Budget line | What to establish before spending |
|---|---|
| rollers | Specify the pilot quantity, purchase/hire option, delivered quote and payment date. |
| drop sheets | Specify the pilot quantity, purchase/hire option, delivered quote and payment date. |
| colour sample cards | Specify the pilot quantity, purchase/hire option, delivered quote and payment date. |
| surface inspection sheet | Specify the pilot quantity, purchase/hire option, delivered quote and payment date. |
Equipment that remains useful after the pilot belongs in a separate setup schedule. Consumables used in accepted work belong in operating cost. Refundable deposits use cash but are not automatically an expense. Do not count the same equipment purchase in full both as setup spending and again as one period's operating expense.
Include costs that are easily missed
Cost furniture movement, preparation repairs, colour changes and cleanup separately, because apparent wall area can conceal most of the labour in an occupied interior.
Prepare the cash schedule in date order. Supplier payments can fall due before the customer pays; a positive paper margin does not fill that gap. Record transport, rejected inputs, corrections and your own working time against the actual trial rather than assuming them to be free.
Set a spending decision
Use this pilot as the smallest meaningful commitment: Quote one vacant room and time protection, preparation and cleanup separately.
Before buying, obtain comparable written quotations with the same item specification, quantity, delivery destination and relevant support terms. Keep uncertain lines marked unknown until you have evidence. If the cash requirement exceeds your available funds, reduce the trial scope, negotiate transparent payment stages or defer the purchase. Do not silently replace missing costs with zero.
The customer approves a colour from a small card but dislikes it across the wall, forcing avoidable rework because an actual-room sample was never agreed.
Use the pricing and cash-flow chapter to test whether accepted sales can cover recurring costs after setup. This page supplies a budgeting method, not a verified opening-cost estimate.
Build the first spending decision from actual specifications
| Resource in this guide | Evidence needed before payment |
|---|---|
| One approved interior finish | Obtain local PDS/SDS and calculate actual pack quantity from coat plan and area. |
| Compatible spot primer/filler | Do not assume interior emulsion repairs active damp or all wall cracks. |
| Application/protection materials | Trial tape removal on delicate paint and protect occupied-room belongings. |
The listed cost exercise below is a narrow scenario, not a complete startup budget. Do not buy this entire list automatically: first decide whether the trial requires purchase, suitable hire or a competent service provider. Record one-time resources separately from repeat inputs, and enter the actual supplier due dates.
A cash-timing exercise using the same example
Assume solely for arithmetic practice that opening cash is zero and the entire listed input bill of KSh 10,200.00 must be paid before handover. With no advance, that amount must be funded before any sale is collected. This deliberately simplified case does not establish when your actual suppliers need payment.
If a buyer hypothetically pays a 30% advance on the example revenue of KSh 13,000.00, cash received would be KSh 3,900.00. Paying the listed bill then leaves KSh -6,300.00. The additional cash needed to avoid a negative balance at that point is KSh 6,300.00. The unpaid remainder is KSh 9,100.00; it is a receivable, not cash already in the business.
The 30% figure is an invented teaching assumption, not a recommended or agreed customer term. Check whether deposits are refundable and which commitments they can actually fund. Do not count the advance again when entering the final collection. Add equipment payments, tax, owner drawings and unlisted operating bills to the dated cash plan as appropriate. The 13-week planner in file 10 shows week-end funding gaps; inspect intra-week dates for a large payment.
Close these budget uncertainties
- Proposed job has not been field tested or independently reviewed by a practising operator.
- Obtain actual local rates and the exact product/material instructions before quoting or scheduling.